2012
"NEVA-LEADER 2" was rolled onto building berth at Nevsky Shipard
On June 23, 2012 the second in the series of 10 self-propelled
Nevsky Shipyard launched the salvage vessel “SPASATEL ZABORSHCHIKOV”
On June 22, 2012 the launching ceremony of the third vessel in a series multipurpose salvage vessel “SPASATEL ZABORSHCHIKOV” took place at Nevsky Shipyard’s slipway
Nevsky Shipyard started mooring trials of the lead multipurpose salvage vessel “Spasatel Karev”
Nevsky Shipyard started mooring trials of the lead multipurpose salvage vessel “Spasatel Karev” (Yard Number 701), capacity 4 MW, Design Project MPSV07.
Nevsky Shipyard participated at the third International Forum “Marine Industry of Russia”
Nevsky Shipyard traditionally participated at the third International Forum “Marine Industry of Russia” as a part of collective exposition of Leningrad area
Nevsky Shipyard laid the keel of the vessel “NEVA-LEADER 6”
On May 15th, 2012 keel-laying for the sixth in the series of 10 dry-cargo «river-sea» type vessels of 7150 dwt RSD49 project (Yard № 405) took place at «Nevsky Shipyard»
E-mail addressees of Nevsky Shipyard staff are changed
Please note that the E-mail addressees of Nevsky Shipyard staff are changed
Vladimir Prudyus was appointed as Director General of Nevsky Shipyard
Vladimir Prudyus was appointed as Director General of Nevsky Shipyard
We are the first!
The team of Nevsky Shipyard participateed in traditional winter sport competitions held by North Western Shipping Company
Nevsky Shipyard successfully passed re-certification audit of Quality Management System
In December, 2011 Nevsky Shipyard successfully passed re-certification audit of Quality Management System existing at the shipyard since 2008.