Solemn keel-laying ceremony of 2 multipurpose small-draft salvage vessels, project MPSV12, took place in the covered shed of Nevsky Shipyard on June 2nd, 2015.
The construction of the vessels is being carried out in accordance with the State Contract signed last October with the Direction of State Contractor of Marine Transport Development Program. The project is developed by Marine Engineering Bureau-Design-SPb, JSC.
General data:
length overall, m, about | 79,85 |
length between perpendiculars, m | 73,39 |
breadth, m | 16,80 |
breadth maximum (with fenders), m | 17,36 |
depth at midship, m | 6,70 |
draught at DWL, m | 3,20 |
draught scantling, m | 4,50 |
deadweight at DWL (approx.), t | 320 |
deadweight at draught scantling, t, about | 1820 |
maximum power of ME, kW | 2x2600 |
sailing speed, knots, ahead at not more than 3,2 m draft (mean) at approx. 85% MCR (not less) |
14 |
Class of Russian Maritime Register of Shipping:
КМ Arc5 [1] AUT2 FF2WS DYNPOS-2 SalvageShip
There was a traditional christening of the base sections of 2 multipurpose small-draft salvage vessels during the ceremony. After that honourable guests secured the Keel-Laying Boards to the base sections.
The representatives of the Customer, classification societies, contracting and design organizations, equipment and materials suppliers, the representatives of mass media participated in the ceremony.